JOHNSTON ATOLL
F&SNO.

01046
USER

SCIENTLELC

TITLE

Camera Station
STRUCTURE /FACILITY NO.

Sandia

SCIENTIFIC STATION NO.

22

BOD

91-4-48
FODGO+120

FUNDING
AGENCY

AEC

($000)
PRE-GO

Prior Cost

ENGR

16.6

PROC

CONST

25.9

TOTAL

FURN

42.5

POST-GO
Est.

1965

TOTAL

16.6

25.9

44.9

44.9

0.9

44.9

87.4

0.9

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-22-Cl
91-22-Al thru A3

PROCUREMENT

91-22-S1 and S2
91-22-M1 thru M4

91-22-E1 and E2

Completed.
POS T-GO

CONSTRUCTION A 20 x 60 x 8-ft. high building with a mobile roof, located
approximately 600-ft. east of Building 20 (JOC), will be provided for high
altitude photographic coverage. The building will be comprised of a 20 x 30-ft.
Camera Operations Room and a 20 x 30-ft. Shop and Control Room in which will
be an 8 x 12 1/2-ft. Darkroom. A removable roof will be required over the
Camera Operations Room. The roof will be track mounted, lightweight, weather proof decking. The Shop and Control Room and Darkroom will be provided with
comfort air conditioning. Chilled and filtered water will be required in the
Darkroom.
A Sandia furnished 40-ft. Photo Trailer will be parked north of and adjacent to
the building. This trailer will require 25 kw peak, and 10 kw continuous, 208
volt, 3 phase, utility power through an Appleton AE 1047 connector. An AEC
furnished,

8 x 8-ft. walk-incooler, with shelves for film storage, will be

positioned by the Photo Trailer.

Three Sandia furnished 8 x 8-ft. transpor-

tainers will also be positioned in line with the Trailer and Reefer.