JOHNSTON
F&SNO.

01041
USER

ATOLL
,

Modification of Optical Station
STRUCTURE/FACILITY NO.

LASL
EG&G

.

SCIENTIFIC STATION NO.

93/94

Bop

91-1-1 (Building 94)
FOD 9/1/70

FUNDING
AGENCY

AEC

SCIENTLIEILC

TITLE

($000)

ENGR

PRE-GO
Prior Cost
FY 69

PROC

16.5
7.8

FY 70

CONST

45.7

84.4

FY 71
TOTAL

108.7

45.7

TOTAL

31.4

93.6
7.8

340.7

425.1

531.1

531.1

903.2

1057.6

FURN

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-93-Cl

91-94-Cl and Ca

91-93-S1
91-93-WIl

91-94-Al and AZ
91-94-S1.

91~93-Ml and M2
91-93-El and E2

91-94-M1 and M2
91-94-E1 and E2

JS 91-93-E100

PROCUREMENT

Completed.

91-94-Wl

Astrodome required for Post-GO installation has.

been purchased and is currently stored at Damon Tract.

Electrical and mechanical

equipment and other long lead time items have been procured.
CONSTRUCTION

Pre-GO construction is complete and includes installation of

the retaining wall and fill, relocation of the 16-in. saltwater line, relocation of
Personnel Bunker and demolition of Hardtack Personnel Shelter.
FY 69, 70 and 71

THE FOLLOWING DESCRIPTION OF WORK TO BE ACCOMPLISHED IS BASED
UPON PRELIMINARY CRITERIA. FISCAL INFORMATION SHOWN IS FOR
PLANNING PURPOSES ONLY; HOWEVER $7800 HAS BEEN AUTHORIZED FOR
ENGINEERING IN FY 1969.
ENGINEERING

To be accomplished.

PROCUREMENT

To be accomplished.

1-47