PART II SPECIAL CONDITIONS SC-1 SCOPE OF THE WORK: The work and services to be performed under this contract, as set forth in Article III of the contract, shall include the following: a. Reconnaissance, Study and Report of Project: The Contractor shall make a preliminary field recon- naissance and study of the Proving Ground site and shall prepare a resultant report covering development plans, utilities, structures, and comprehensive recommendations for a definite construction program with a time schedule and cost estimates coordinated with the program. b. Engineering, Design and Inspection: 1. The Contractor shall make all necessary topographical and other surveys (except real estate or boundary surveys) and maps and make or have caused to be made all necessary subsurface investigations. The Contractor shall prepare for the approval of the Commission preliminary studies, sketches, layout plans, investigations, recommendations and reports; and estimate of cost of proposed construction items and utilities and appurtenances thereto. 2. After approval by the Commission of pre- 3. The Contractor shall prepare cost and liminary plans, sketches or drawings, the Contractor shall prepare detailed working drawings and specifications in accordance with Commission or Governmental standards. material estimates based on the approved drawings and specifications. 4. he Contractor shall provide a Resident Engineer and other necessary personnel to supervise and inspect the construction work to see that all work is per- Formed in accordance with the approved plans and specifica- tions. 5. The Contractor shall prepare record drawings to show construction as actually accomplished. These drawings shall be prepared by revising construction drawings, or where drawings cannot be satisfactorily revised, by preparation of new drawings. sc-1