‘GC-IITI ACCOMPLISHMENT OF WORK - CONSTRUCTION III-1 CHARACTER OF WORK AND MECHANICS - This work shall be executed In the best and most workmaniike manner by qualified, careful and efficient mechanics in strict accord- ance with the drawings and specifications. III-2 BASE LINES AND GRADES - The Contractor shall make all necessary fleld surveys required to adapt con- struction to terrain conditions; furnish all grades which are essential to the construction of the various items, and stake out the base lines of all items of construction at the construction site. The Contractor shall furnish all stakes, templates, platforms, equipment, ranges and labor that may be required in setting and cutting, or laying out any part of the work. The Contractor will be held responsible for the proper execution of work to such lines and grades, and all stakes or other marks shall be preserved by him until their removal is authorized by the Contracting Officer. III-3 DRAWINGS AND SPECIFICATIONS - Where no figures or memoranda are given, the drawings shall be accurately followed according to scale. In any case of discrepancy in the figures on the drawings, the matter shall be inmmediately submitted to the Contracting Officer without whose decision said discrepancy shall not be adjusted by the Contractor, save only at his risk; and in the settlement of any complications arising from such adjustment, the Contractor shall bear all expense involved. In case of differences between the drawings and specifications, the specifications shall govern. Where specifications or standards of the Federal Government, technical societies or testing organizations are included in these specifications by reference the latest revision to such specifications or standards shall govern. III-4 INSPECTION - AS set forth in Article III of the contract, the work shall be conducted under the general directions of a responsible representative of the Contractor and is subject to inspection by his appointed inspectors to insure strict compliance with the terms of the contract, and with the provisions of the drawings and specifications as approved by the Commission. No inspector is authorized to change any provision of the drawings or specifications without authorization of the Com- mission, or its authorized representative, nor shall the presence or absence of an inspector relieve the Contractor from any requirements of the contract. Gc-4