Contracting Officer.
The Contractor will be responsible
for all unauthorized cutting or damaging of trees and
shrubs, including damage due to careless or negligent
operation of equipment, stockpiling of materials, or
tracking of grass areas by equipment.
bd.
Care will be taken by the Contractor in felling trees authorized for removal to avoid any unnecessary
damage to vegetation that is to remain in place. Any
limbs or branches of trees broken during such operations

shall be trimmed with a clean cut and painted with an

approved tree pruning compound if required by the Con-

tracting Officer.

The Contractor will be liable for or

may be required to replace or restore at his own expense

all vegetation that may be destroyed or damaged which has

not been protected or preserved as required herein.

I-5

LIABILITY FOR DAMAGES - The Contractor shall be

responsible for all damages to persons or property,

in-

cluding damages to underground property or underground
utilities, which are indicated in the specifications or
drawings or the existence of which are otherwise made known
to the Contractor; that occur as a result of his fault or
negligence in connection with the prosecution of the work,
and shall be responsible for all materials delivered and

work performed until completion and final acceptance of

the construction.

GC-IT

CONDITIONS OF WORK - ADMINISTRATION

II-1 BONDS AND INSURANCE - The Contractor shall procure
and thereafter maintain only such bonds and insurance in
such forms and in such amounts and for such periods of time
as the U. S. Atomic Energy Commission may require in writing; all as set forth in Article XIX of the contract.
II-2
IDENTIFICATION OF EMPLOYEES - All employees of
the Contractor or any of his subcontractors must be cleared
by the Contracting Officer before being allowed entrance
to the Project Site.

After such clearance, each employee

will be furnished with an identification badge or card
which the employee must display at all times while within
the limits of the area.
The identification badges or cards
will be furnished by the Government at no cost to the Contractor, but the Contractor shall be responsible for their
immediate return to the Contracting Officer upon release