ends shall be pinked.
Curtains shall be provided with
ropes and pulleys for pull-up operation.
8-25.

FINISH HARDWARE:

a.
General Requirements:
Contractor shall furnish and install all hardware shown on the drawings,
herein specified or required to complete the finish
harcware installation for the project.
Except where

otherwise called for, all finish hardware shall, within
the limits of practical availability, be of

corrosion-

resistant materials or of materials processed to resist

corrosion. All hardware shall be accurately fitted,
and with the exception of supporting hardware, all surface applied hardware shall be removed before the
painter's finish is applied; and subsequent to completion
of painting shall be replaced and left in good working
condition.

b. Hardware Elsewhere Specified: Certain finish
hardware items, including hardware for the following
installations, are specified under the section of
specifications pertaining to those installations:

c.

l.

Pre-fabricated metal buildings

2-

Vault doors

3.

Steel plate or other special doors

4,

Window screens

5.

Movable curtains and sliding panels

Keying:

All cylinder locks and padlocks

shall be keyed, master keyed and grand master keyed
in @ manner to be determined by the Contracting Officer.
d.
Hardware List:
Except as otherwise noted,
finish hardware shall conform to the following list:
1.

Latch Sets: latch sets where called for

on the drawings or required shall be "Parlyn" Door

Latches as manufactured by Parlyn Ltd., los Angeles,
California or approved equal; of the types indicated.

Case and pulls shail be of aluminum; operating
mechanism, except for bronze pins and chromium plated

steel springs shall also be of aluminum.

8-17

Select target paragraph3