The following explanations apply to the columns in Table B.2.

Column 7

Column 1
The station numbers are for Operation Greenhouse.

A reference mark was filed on the 33 and 34
stakes at the approximatetop of the straight
portion of the stake, diametrically opposite to
the direction of bend. All 33 and 34 stakes are
bent 180° from Ground Zero.

-—

Column 2

The points (Pt. 1, 2, and 3) are indicated in

Column 8

the following sketch.

The original working point (W.P.) was reestablished, and the distance was measured from
this point to the approximate center of the
straight portion of each stake.

>

eras
\

«

72 Ne

ae
Se.=
30°
\

ol
fo)

ol
PT 3

°

\

|

PT 4

e

m
—_—

sy TO GROUND ZERO
_-—-~o——e— SS a

Column 9

ee
0

Ao

The length of bend was measured from the

3

|

a“

reference mark, column 7, along the outside

288

curve to the end of the stake.

ie

Column 6

Column 10

The postblast ground elevations were taken
on 17 July 1951.

distance from a vertical line through the refer-

Taste B.2
,

(1)

(2)

(3)

34a

W.P

280.05

(4)

10.32
10.31

3

10.43

309.05

261°30/02"

1

10.18

2

10.16

3

W.P

10,13

339.07

261°30'02"

1
2
3
34d

W.P
1

2
3

(5)

261°30'02"

1
2

34c

CRATER SURVEY,SITE C

Distance,
Elev.,
W.P. from
Azimuth
Top of
Ground Zero
of W.P.to
Stake
(ft)
Ground Zero
(ft)

Pt.

W.P.

ence mark, column7, to the end of the stake.

Preblast

Sta,
No.

34b

The horizontal length of bend is the horizontal

9.69
9.67
9.59
369.10

261°30'02"
8.90

8.94
8.94

29

Select target paragraph3