purpcse vchicle operators,
An inadoquate seale for DUK: drivers also develcped,

How-

ever, Port Detachment, 7126th 4U was able to furnish men to be
trained anc used as DUKW drivers.

This problom is similar te the persomel problem of all
activitics,

A recommend:tion for its. solution ia contained in Sec=—

ticn XVI of this report.

Lh.

.

Port Operations:
The personnel directly involved in the handling of the port-

facilities of TC 7.2 were the Transportation Officer, the Port Operations ufficer, the Documentation Section, and the officers and EY of ,
Port Detachmant, 7126th AU.

The operation of the port facilivics of

TG 7.2 wae under the direct supervision of the Port Operations: Offices
and his assistants.

Operation of tho pert was perf. rmed by.Port De-

anak

tachrent , 726th 40 and augmented by other M26bh AU personnel,

This

' organization had the capability of operating all port facilities at

ENTVETOK ISL:ND, planning and controlling the discharge and Loading
of cargo and passengers, manifesting cargo, compiling the Passenger
lists and outturn reports, coordinating the use of harbor craft with
the marine section of k & N ‘and supervising the cperation of the

.

™%G 7,2 Boat Pool, “Tho copa bi Lity was sustained for “naintaining an
18-hour daily operation for ope vesso with «a vady bomnangs capacity

of 600 to 200 nedsurancntfina per day,
Tho present gear loft was clequate for sustained support to

the port operations and matorials handling equipment croved adsquate
to support the port operaticns on a sust-dicd basis as specialized

16k ene

fee eee oe eee

-

Select target paragraph3