QUESTIONS AND COMMENTS - SUMMARY OF COSTS
NORTHERN MARSHALL ISLANDS RADIOLOGICAL SURVEY
1.

AERIAL - None

2.

GROUND & SEA
Terrestrial
-

Ground monitoring surveys are not included.

-

Soil profile samples, necessary for plant uptake studies are not

-

Personnel salaries are not stated as being included.

included in the minimum figure.

Marine
-

3.

Personnel salaries are not included.

CONTRACTORS
-

BNL 189 received and costs shown.
[It is not known whether
BNL costs are factored into the LLL estimates shown for terrestrial.

-

Is whole body counting of the No. Marshallese desired?
are shown.

-

189's not available for Univ. of Wash., and EPA.

No costs

:

It is not

known whether their costs are factored into the LLL estimates for

“Terrestrial” and "Marine".

Tt

4.

CONTINGENCY

-

Since only the minimum options are listed for the "Terrestrial" and
"Marine" programs, the possibility exists for modifications of these
costs in the upward direction.

-

Have all salary costs been included?

-

Have all analytical costs been included?

FY 1980 costs

-

Im view of past experience, funds will be necessary to continue

-

Have all costs for the final report preparation been included?

sample analysis into FY 1980.
for this period.

Approximately 300K should be budgeted

Select target paragraph3