QUESTIONS AND COMMENTS - SUMMARY OF COSTS
NORTHERN MARSHALL ISLANDS RADIOLOGICAL SURVEY
1.
AERIAL - None
2.
GROUND & SEA
Terrestrial
-
Ground monitoring surveys are not included.
-
Soil profile samples, necessary for plant uptake studies are not
-
Personnel salaries are not stated as being included.
included in the minimum figure.
Marine
-
3.
Personnel salaries are not included.
CONTRACTORS
-
BNL 189 received and costs shown.
[It is not known whether
BNL costs are factored into the LLL estimates shown for terrestrial.
-
Is whole body counting of the No. Marshallese desired?
are shown.
-
189's not available for Univ. of Wash., and EPA.
No costs
:
It is not
known whether their costs are factored into the LLL estimates for
“Terrestrial” and "Marine".
Tt
4.
CONTINGENCY
-
Since only the minimum options are listed for the "Terrestrial" and
"Marine" programs, the possibility exists for modifications of these
costs in the upward direction.
-
Have all salary costs been included?
-
Have all analytical costs been included?
FY 1980 costs
-
Im view of past experience, funds will be necessary to continue
-
Have all costs for the final report preparation been included?
sample analysis into FY 1980.
for this period.
Approximately 300K should be budgeted