{
|
5
Appendix B — Tables of Relevant Facts
649
4
CLEANUP (Cont'd)
Equipment
Four Boston Whalers
Insect Sprayer
Dust Suppression System
Air Conditioners
Outboard Motors
Welding Machines (3)
Bulk-haul Boat Pumps
75KW Generator
Rate Meters/Sealers
and Probers
Gas Cylinders
_
Aomon Crypt
Sheetpiling/ Associated
Equipment
Silt Screen
Desilt Operation
Excavation Labor
Pile Driving Labor
Construction
Magnetometer Service
Channel Dredge
57.1
2.6
64.4
4.0
10.0
1.7
10.8
13.7
19.3
2.6
325.0
138.5
8.8
8.3
32.4
44.3
8.0
9.1
75.6
Core Drilling Personnel and Rig, (Mobile,
AL, District Engineers)
Typhoon Alice
Roads, grounds, shore
protection, water, sewer,
electrical lines
Billets, Building 462
Hangar
Carpenter Shop
Shipping/Receiving
Warehouse
Army Maintenance Shops
Warehouse, General
Warehouse, Supply
Warehouse, Subsistence
Tradewind Club
Total Cleanup Costs
186.2
47.1
342.0