RADIOLOGICAL CLEANUP OF ENEWETAK ATOLL

based on construction considerations and not on environmental
geological, or radiological considerations. Up to that height, the cap

structure would remain basically a series of slabs with no vertical walls.

i.e., a paving project which could be accomplished with a minimum of

design, equipment, and skill. POD estimated the volume of Cactus Crater

up to a height of 3 feet above the reef, where tremie operations would no

5
e

longer be required, as 51,917 cubic yards.2! POD estimated thatthis would

contain 29,870 cubic yards of loose contaminated soil mixed in a Slurry,
Additional soil would be placed on top ofthe slurry to which cement woulg
be mixed by a disc-harrow, water would be applied, and the mixture
compacted. Depending on the amount of material added in this sojj.
cement operation, the volume of the dome would be increased,first by

increasing the diameter of the keywall up to 430 feet and the domeheight

up to 30 feet, then by extending the domeinlandas far as necessary. The
POD design would accommodate up to the 200,000-cubic-yard worst case
identified by Field Command and could accommodate more by simply

increasing the extension (Figures 8-6, 8-7).22
The POD designers assumedthat sufficient contaminated soil would be

stockpiled before the tremie operation began so that it could proceed
efficiently and that, by the time the tremie operation was completed, an

estimate of the contaminated soil remaining could be made accurately

enoughthat the shape andsize of the domecould be determined.?3

[

To prevent scouring and undermining of the container by waveaction,
POD designed a keywall to be constructed completely around the

|
‘

contaminated material. The keywall was to be keyed | foot into the reef

‘

bedrock, where firm reef existed, and embedded to a depth of 8 feet below
the top of the adjacent surface in areas where the reef was fractured or

where no reef existed (Figure 8-8).24 The keywall would not prevent

migration of fine material from the crater bottom through ground water
action in the fractured rock and areas where no beach rock existed.
Surveys in 1974 and 1975 indicated that a thick layer of material on the
crater bottoms and in the fractures was more contaminated than the
sediment covering it. Furthermore, this contamination was leaking into

the lagoon from Cactus Crater.25.26 There was no EIS requirement to

clean out the crater and fractures nor did there appear to be a practical
means of accomplishing the task. DNA had advised POD that leakproof

containment wasnotrequired or intended.27 POD believed that the tremie

method would fix the material added during the cleanup project in place

and prevent washouts through the Cactus Crater bottom if the slurry was
;
\

placed properly. However, POD was concerned that the troop engineers
had little experience with tremie placement of slurry and recommended
that Field Command engagea qualified contractor to oversee and provide