soil Cleanup Planning

4. and high subsurface levels would be encountered.) Surface

expected. tion levels over 80 pCi/g were multiplied by a factor of two and

contamina 40 oCi/g by 1.3. Applying this factor to theinitial estimates for

ihose Over ost critical islands (so far as soil transport was concerned)

the four bled the estimate of soil volumes to be removed and
amost do 98.99 As it happened, use of Treat Factor resulted in

(rInsPo-mation of the soil volume to be removed, and the actual volume
overswas only about 5,000 cubic yards (6 percent) overthe original,

remo cted DOE-ERSP estimate. !00.10!

ae of the factor led to pessimistic predictions at the conference. It
yweated that cleaning Enjebi to residential levels (40 pCi/g) would

in ove removing 58,670 cubic yards—more than could be transported in

he year remaining, even using bulk haul. It also indicated that 25,000
cubic yards would have to be removed from Lujor just to prevent the

sland from being quarantined (i.e., to cleanit to less than 160 pCi/g). To

qualify Lujor for agriculture (80 pCi/g) as the dri-Enewetak desired, it
appeared that 49,400 cubic yards would have to be removed and
transported.
;

The boat transportation available would have been adequate to move
the predicted volumesif soil cleanup had begun on time, however,it did

not appear adequate to move the predicted volumesin the time remaining.
I) appeared that, unless the project were extended past 15 April 1980, a

maximum of 12 months would be available to excise and transportsoil

from the four islands, leaving another 2-1/2 months to complete Runit soil

cleanup and | month to complete closing the concrete cap!02 (Figure 6-16).
The latest estimates of boat capability were that only 48,000 cubic yards
DESAIS REMOVAL

ALL EXCEPT RUNIT

tau 78

°

Q.

DEBRIS AUNIT

oO

21 May 79

SOIL REMOVAL ALL ISLANOS

Q

18 Aug 29
COMPLETE
RUNIT

9

4 SUN 78

_TREMIE OPERATION

°
5 ae 18

CRATER
SEA WALL

2
16 Jud 78

Oo
1 Few 79

SOIL CEMENT

Q_LKEYWALLACAP >
18 Ape 70

QO
COMPLETE
KEYWALL
Oe
9
1S Sep 79

FIGURE 6-16. ENEWETAK CLEANUP PROJECT SCHEDULE, 4 MAY 1978.