r
Y
Appendix B — Tables of Relevant Facts
647
FIELD CONSTRUCTION(Cont'd)
Enewetak Camp Expansions
400-gallon Aqua Chems (3)
OPLAN Building
Modifications
Electrical Modifications
Installation of
Generators/Aqua Chems
Lens Well and Pipeline
Laundry Facility
Latrine Building 19
JP-4 Discharge System
Detention Facility
Install Trailers
Install Reefers
Reproduction Room,
164.1
267.7
10.1
37.7
18.2
76.6
13.4
17.5
$.3
8
15.6
Building 15
7.7
Women’s Quarters
~
11.1
1586.9
Lojwa Base Camp Construction
Material (Army
Requirements)
Salt Water Pump Station
MessHall
Latrine Trailers
600-gallon Aqua Chems (4)
Navy Momatfor Beaches
645.8
1051.6
27.1
219.9
10.1
278.2
28.1
3207.6
Total Field Construction Costs
CLEANUP
Dri-Enewetak Labor
Johnston Atoll Personnel Assistance
Field Command Surface Shipments
MSC Surface Transportation
Field Command Air Cargo
MACAir Transportation (routine)
MACAir Transportation-Typhoon Alice
Oakland, CA, Army Base-Packing and Crating
Commercial Air Cargo
13.5
11.3
2.6
1965.4
5.1
2194.0
56.2
19.2
12.4