Page 8 of 9

|

|

| CAPITAL EQUIPMENT REQUIREMENTS FOR FY79 AND FY80
FY79

Total

|

AMS

|

Fy80

*

‘Total

- $1, 200K

Laboratory/ Analytical

Equipment

$

—$1,200K

50K

$

50K

‘

FY80

Additions

=

FY80

Replacements

(ss $1, 155K
$

$. 45K

30K

$

20K

ee ee ee me ee on

Laboratory test equipment, soil sampling analysis equipment, and other equipment which suppor!
the laboratory portion of the Aerial Measurements Program,
Communications Suppdrt
Equipment

.

$

40K

*

$

25K

$

25K

wQ-

|

Communications support equipment for the Aerial Measurements Program.

.

Photo/ Optical.
Equipment

$ 175K

$ 150K

$ 150K

Operations and
Aircraft Support
Equipment

$

$

$

295K

250K

225K

-0$

25K

Equipment to support the field portion of the Aerial Measurement Program. Funding alsoinch
the acquisition of aircraft support equipment and fixtures to support DOE owned aircraft utilized on th:
Aerial Measurements Program. Major acquisition during FY79 will be a scanner gyro Stable platforr
During FY80, a thermovision will be acquired.
.

prog

» |

FUSER ERR REP
EREEE

*

Select target paragraph3