Page 8 of 9
|
|
| CAPITAL EQUIPMENT REQUIREMENTS FOR FY79 AND FY80
FY79
Total
|
AMS
|
Fy80
*
‘Total
- $1, 200K
Laboratory/ Analytical
Equipment
$
—$1,200K
50K
$
50K
‘
FY80
Additions
=
FY80
Replacements
(ss $1, 155K
$
$. 45K
30K
$
20K
ee ee ee me ee on
Laboratory test equipment, soil sampling analysis equipment, and other equipment which suppor!
the laboratory portion of the Aerial Measurements Program,
Communications Suppdrt
Equipment
.
$
40K
*
$
25K
$
25K
wQ-
|
Communications support equipment for the Aerial Measurements Program.
.
Photo/ Optical.
Equipment
$ 175K
$ 150K
$ 150K
Operations and
Aircraft Support
Equipment
$
$
$
295K
250K
225K
-0$
25K
Equipment to support the field portion of the Aerial Measurement Program. Funding alsoinch
the acquisition of aircraft support equipment and fixtures to support DOE owned aircraft utilized on th:
Aerial Measurements Program. Major acquisition during FY79 will be a scanner gyro Stable platforr
During FY80, a thermovision will be acquired.
.
prog
» |
FUSER ERR REP
EREEE
*