'8 September: Present schedule shows the following for delivery of cans to NTS‘ .

md possible use dates as follows:

shot 1, delivery done for use 9/14; shot 2

livery 9/22 for use 16/1; shot 3
were shots within November.
‘rosby clamps, etc. going on.

f the 12th.

, delivery 10/5 for use 10/15; and a couple oN

Lots of search for and ordering of cabling, connectors,
Blossom reported that drill rigs would be in the night

A dry run is planned for the evening of the 8th by KG &G.

Ogle said

het DMA asked LASL to consider U1L2CEO3B for a 40 KT shot in late December, and after
meeting with Westervelt and Hoerlin, replied to Betts that “could do but cover is
00 feet insufficient on 450OW to the one-third basis."

This particular yield is

2ing planned by LASL for a 2000 foot hole on 14 January 62.

2en requested for two additional shots, a 100 ton shot
jded 10 KT shot

Drawings have now

:

and an

Blossom and Newman discussed the 5000 foot core

ryle, to be positioned one-half mile west of 3-300.

Blossom wanted to know if HIVAC

yuld be okay for recovery drilling and Newman replied, "Yes, if debris can be

mtained and personnel protected."
> needed ts for post-shot drilling.

Blossom also inquired 25 to how many rigs would
Newman checked wit: 2xkkims Cowon on this dar

» saa if the ORCHID haniveare could be usec for UL2 EO3B if necessary anc possible,
1 Cowmi said fine if this was to be done earlier than ORCHID.

Discussions with

+ Cox disclosed that, following a meeting with Bradbury, the first shot date is
w 15 September.