'8 September: Present schedule shows the following for delivery of cans to NTS‘ . md possible use dates as follows: shot 1, delivery done for use 9/14; shot 2 livery 9/22 for use 16/1; shot 3 were shots within November. ‘rosby clamps, etc. going on. f the 12th. , delivery 10/5 for use 10/15; and a couple oN Lots of search for and ordering of cabling, connectors, Blossom reported that drill rigs would be in the night A dry run is planned for the evening of the 8th by KG &G. Ogle said het DMA asked LASL to consider U1L2CEO3B for a 40 KT shot in late December, and after meeting with Westervelt and Hoerlin, replied to Betts that “could do but cover is 00 feet insufficient on 450OW to the one-third basis." This particular yield is 2ing planned by LASL for a 2000 foot hole on 14 January 62. 2en requested for two additional shots, a 100 ton shot jded 10 KT shot Drawings have now : and an Blossom and Newman discussed the 5000 foot core ryle, to be positioned one-half mile west of 3-300. Blossom wanted to know if HIVAC yuld be okay for recovery drilling and Newman replied, "Yes, if debris can be mtained and personnel protected." > needed ts for post-shot drilling. Blossom also inquired 25 to how many rigs would Newman checked wit: 2xkkims Cowon on this dar » saa if the ORCHID haniveare could be usec for UL2 EO3B if necessary anc possible, 1 Cowmi said fine if this was to be done earlier than ORCHID. Discussions with + Cox disclosed that, following a meeting with Bradbury, the first shot date is w 15 September.