VOL, Il
BOOK 6
2,

CHAPTER Il
SECTION 2

All shutters were locked in open position

Blidg, 90 - Air Task Force Group Headquarters:
1, All doors were removed
2.

All shutters were locked in open position

Bldg. 91 - Alert Crew - Crash Truck:
1.

All shutters were locked in open position

Bldg. 92 - L-13 Operations:
1.

All doors were removed

2.

All shutters were locked in open position

Bidg. 94 - POL Pump House:
1,

All doors were removed

2.

All shutters were locked in open position

Bldg. 117 - Five NRDL Buildings:
1.

All doors were removed

2.

All shutters were locked in open position

Bldg. 84 - Power Transmitter:
1,

All doors were removed

2.

All shutters were locked in open position

Bldgs. 72, 135, 507, 508 - Supply Office; Drone Crew, briefing and
Operation; Hobby Shop; Library, respectively:
1.

Buildings were opened up

2,

Longitudinal walls were braced

3.

Line of supports was provided for 2nd floor beams

6-43