VOL, BOOK 5 CHAPTER IV SECTION 14 STATION 201 - SITE FLORA. A painter and spray equipment were furnished to cocoon corregated collimator pipes in this station. Extensions were made to three 3-inch conduits running from Station 201 to the outside of Station 1. STATION 202 - SITE ALICE. Four cinch bolts capable of bearing two tons were installed in concrete footing for mounting calibration equipment. In order to prevent spill of the earth fill and to provide shielding, pipes extending through the wall of Station 202 were grouted to a minimum depth of 1-1/2 feet along the pipes. STATION 203.01 THRU .09 - SITE FLORA TO SITE ALICE. Horizontal and vertical control was established for the alignment of these stations as requested by the User. (See also this report, Scientific Stations, Volume I, Book 2, Chapter V.) STATION 204 - SITE FLORA TO SITE ALICE. At the User's request, the interior of this station was papered; approximately 244 holes were cut in the station; one thousand wooden blocks 1" x 4" x 10'' were fabricated for use in handling helium bottles; a cable splicer was furnished to assist in replacing a section of seven-quad cable found inoperable between Sites Flora and Gene; and a 3-phase, 4-wire (50 KW, 208 volts) power system was furnished from Sub Station 1 to Station 205 on Site Flora. STATION 206. A 3-phase, 4-wire (100 amps, 208 volts) power system was also furnished from Sub Station 200 to Station 206. A canvas shade was erected over Station 206 (transportainer at Site Alice), and labor was furnished to insulate 100 square feet of adjacent air duct. STATIONS 1000.06, 200, 5, 205. Four pairs of timing cable were installed from Station 1000. 06 to Station 200, and seven pairs were installed from Station 5 to Station 205. For Project2.1b,a220 volt Mercoid switch, pressure 0-100 lbs., was furnished. STATION 250 - SITE YVONNE. The NRLK compressor at this station was supplied with emergency 8.6 amps power at 220 volts to enable the compressor to function after the power house was closed through H-hour; fill and grouting was required for a distance of three inches on each end of the pipes between Stations 250 and 252; and two electricians were furnished for approximately six man days to assist in completing the technical wiring in NRLKstations on Site Yvonne. STATION 251 - SITE YVONNE. An addition to the fill was required at this station, extending the base an additional 10 feet. STATION 252 - SITE YVONNE. A light switch on the outside rear wall was moved to the wing walJ, to provide for the User's installation of a lead shield 5-13