VOL. BOOK 5 IV CHAPTER SECTIONS 12 - 14 SECTION 12. TASK UNIT 11 Support rendered Task Unit 1! by Holmes & Narver consisted solely of the installation of a drinking fountain with fresh water supply at Station 1 on Site Flora, Four man hours were involved. SECTION 13. PROGRAM 1 PROJECT 1.3. The placing of a steel box atop Station 300 at Site Alice, as directed by LASL-J-11, was the extent of services provided to this Program. Total man hours were 18. SECTION 14. PROGRAM 2 PROJECT 2.la. Miscellaneous services supplied to this program included installation of cables required to deliver three timing signals to NRL's location in Bldg. 232 on Elmer, and installation of a seven-quad cable furnished by NRL, between the Site Elmer telephone switchboard and Bldg. 232. In addition, a "30° Hot Mounting Plate" was fabricated according to NRL specifica- tions; men and equipment for handling the User's material were furnished; a motor was rewound and a room cooler compressor checked; power was provided and connections made to two NRLK trailers in the Site Elmer AEC Compound (a three-phase four-wire circuit of 60 amps and 208 volts was required for each trailer); a forklift and operator were furnished to NRLK to load pallets of lead bricks into trailers at Site Elmer, for three working days; a fresh-water line was furnished to an NRLK trailer at Site Elmer; material and equipment were provided for the purpose of cocooning the doors of five NRLKtrailers. Other Holmes & Narver services were provided to Program 2 Users at specified stations, listed below: STATION 1 - SITE FLORA. A shelter was constructed over the compressor for an NRLK dehumidifying unit. STATION 200 - SITE ALICE. Three blowers were installed to ventilate Station 200 pending the arrival of scheduled dehumidification units (this step was re- quired to expedite installation of copper shielding); an extension to the sump pump discharge line was installed to carry discharged material into the ocean; a decrease to one-third of the existing rate of air delivered to the coax room was effected at the User's request; six electricians were furnished to make a rapid cut-in of electromagnetic filters; two laborers were furnished to load equipment into an NRLK trailer on M -3 Day and M -4 Day; and one electrician and one refrigeration man were requested to stand-by until 2400 hours on M -1 Day. 5-12