QUAN.| UNIT TOTAL cost AS LISTED BELOW (Continued) iI “"IOA DESCRIPTION OF PROPERTY UNITS STATION NOS, 613.01 AND 613.02 (Continued) Locations: Station No. 613.01 Station No. 613.02 (‘No installed equipment. ) Olive Yvonne Construction Contract Cost Engineering Cost 2 Each 3,287 .08 294.54 3,581.62 GENE STATION NO. 614 A reinforced concrete cube 1'-6" x 1'-6" x 1'-6" with two embedded conduits furnished by the User. (No installed equipment. ) Construction Contract Cost Engineering Cost 667 .74 54. 3h 1 Bach 722.08 AS LISTED BELOW A reinforced concrete cube 1'-6" x 1'-6" x 1'-6" with three embedded THT- conduits furnished by the User. XIGNaddV STATION NOS. 615.01 AND 615.02