DESCRIPTION OF PROPERTY UNITS

AS LISTED BELOW (Continued)
STATION NOS. 611.02 THRU 611.04 (Continued)
3'-6" x h'-0" x 3°-9" deep O.D.
Locations:

Station No. 611.02

Station No. 611.03

Station No. 611.04
(No installed equipment. )

Kate

Mary

Sally

Construction Contract Cost.

Engineering Cost

3

Each

23,469.18

1,134.09

24 603 PT

ELMER

STATION NO. 612

3,263.92
305.19

AS LISTED BELOW
STATION NOS. 613.01 AND 613.02
Reinforced concrete pad 9'-0" x 3'-0" x 3'-0" thick, placed at grade

level, supporting one 8" diameter vertical pipe 10'-O" high.

Each

3.569.411

“y

Construction Contract Cost
Engineering Cost

1

XIGNaAddV¥

Reinforced concrete slab 5'-O" x 2'-0" x 5'-0" thick, placed at grade
level, supporting two vertical 8" diameter pipes 15‘-0" high.
(No installed equipment. )