TOTAL COST IT KATE (Continued) “TOA 9€ToL QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO, 602 (Continued) Installed equipment: 3 - 5 KVA "General Electric" transformers, serial Nos. B-266472, B-266434, B-266431, H & N Nos. TR-46, TR-47, TR~-L9. (The above list does not contain any user-furnished or user-installed equipment. ) Allocated to all Stations SUB-STATION NO. 602 Sub-station No. 602 consists of three transformers installed in con- junction with Station No. 602. Includes all necessary cutouts. switches, wiring, conduits, and fittings. Bach Installed equipment: 3 - 5 KVA "General Electric" transformers, serial Nos. B-266472, B-266434, and B-222431; H & N Nos. TR-46, TR- 47, and TR-49. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 8, 378.48 456.36 8, 834.84 STATION NO. 603 Reinforced concrete structure 10'-8" x 24'-8" x 10'-k" high O.D. with 1°-O" thick walls and roof and 1'-4" thick floor slab; embedded unistruts in walls, ceiling and deck; divided into two rooms by a XIGNGYddV MARY