QUAN. UNIT TOTAL COST II JANET “TOA DESCRIPTION OF PROPERTY UNITS STATION NO. 601 Consists of reactivation of Greenhouse Station 301J complete with electrical light and power wiring and fixtures, ventilating and power generating equipment. (No installed equipment. ) Each Allocated to all Stations SUB-STATION NO. 601 Sub-station No. 601 consists of three transformers installed in conjunction with Station No.-601. Includes all necessary cutouts, switches, wiring, conduits, and fittings. Installed equipment: Bach 2 - 15 KVA "Gregory" transformers, serial Nos. 5026277 and (none), H & N Nos. TR-135 and TR-151; 1 - 15 KVA "AllisChalmers" transformer, serial No. 2248616, H & N No. TR-152. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 11,641.27 355 -63 11,996.90 STATION NO. 602 Consists of reactivation of Greenhouse Station 301H complete with electrical light and power wiring and fixtures, ventilating and GEtoL power generating equipment. Each XIGNaAddV KATE