QUAN. UNIT TOTAL COST II FLORA (Continued ) “TOA DESCRIPTION OF PROPERTY UNITS SUB-STATION NO. 1 (Continued) 8°--O" high chain link fence including a 3'-0" hinged gate, and grounded to a grid of #1/0 bare copper wire. Installed equipment: Bach 3 - 100 KVA "“Allis-Chalmer” oil immersed, out- door transformers, serial Nos. 2450637, 2450701, 2450647, H & N Nos. E-305, E-307, B-308. (The above list does not contain any user-furnished or user- installed equipment. ) Aliocated to all Stations STATION NO. 2 A one-story, 4 room wood frame structure, 0.D. 2h'-0" x 48°-0" x 10'=11" mean height, 1/2” exterior plywood siding and composition roofing, erected on a reinforced concrete floor slab, with a 4'-0" x 33*-0" uncovered concrete entrance slab and two equipment slabs. Interior stud partitions plywood sheathed one side; area 1152 square feet: volume 12576 cubic feet. Includes 58 lineal feet of wood framed work bench, 2 plywood hot cabinets and open shelving are built-in, wood doors and sash with one exterior sliding door 10'-0" x 8'-0"; Installed equipment: 1 dehumidification unit; 1 supply fan unit. Construction Contract Cost Engineering Cost 66-1 Each 38,686.55 3,311.99 43,998.54 XIGNaddV¥ complete with electrical, telephone and communication wiring and fixtures, dehumidification and ventilating equipment and aluminum duct work.