II

FLORA (Continued )

“TOA

DESCRIPTION OF PROPERTY UNITS

SUB-STATION NO. 1 (Continued)
8°--O" high chain link fence including a 3'-0" hinged gate, and grounded
to a grid of #1/0 bare copper wire.

Installed equipment:

Bach

3 - 100 KVA "“Allis-Chalmer” oil immersed, out-

door transformers, serial Nos. 2450637, 2450701, 2450647, H & N Nos.

E-305, E-307, B-308.

(The above list does not contain any user-furnished or user- installed

equipment. )

Aliocated to all Stations

STATION NO. 2
A one-story, 4 room wood frame structure, 0.D. 2h'-0" x 48°-0" x

10'=11" mean height, 1/2” exterior plywood siding and composition

roofing, erected on a reinforced concrete floor slab, with a 4'-0"
x 33*-0" uncovered concrete entrance slab and two equipment slabs.

Interior stud partitions plywood sheathed one side; area 1152 square
feet: volume 12576 cubic feet. Includes 58 lineal feet of wood framed
work bench, 2 plywood hot cabinets and open shelving are built-in,

wood doors and sash with one exterior sliding door 10'-0" x 8'-0";

Installed equipment:

1 dehumidification unit; 1 supply fan unit.
Construction Contract Cost

Engineering Cost

66-1

Each

38,686.55

3,311.99

43,998.54