TOTAL COST IT FLORA (Continued) “TOA 96-1 QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO, 1 (Continued) 6'-6" x 6'3" mean height, constructed on skids; floor, roof and louvered sides of 1/2" plywood; areas 42 square feet; volume 263 feet b Each Station No. 1 also includes a pit latrine which is a one-story wood frame building 14'-6" long x 14'-4" wide, on a 5" concrete slab floor and containing two metal trough urinals, and wood frame toilets over 6'-0" deep pits. E.C.0. No. 3707 authorizes the installation of a canvas cover on a wood frame to replace roll-up door No. 5 which was eliminated. Installed equipment: 1 - 25 gallon "Larco" water cooler, serial No. 420-13725, H & N No. CA-309; 2 - 15,000 CFM "Chicago-Gyro" explosion proof exhauster fans, serial Nos. 6826, 6820, H N Nos. F-452, F-453 1 - 2 ton, 5 H.P. "Kimball Elevator Co." working platform, (no serial No., no H & N No.); 2 - 115 volt "Faraday" sirens, 1 received, serial No. 7Al13G2, H & N No. E-595; 1 - 20 ton "Crane Hoist Engineering Corp traveling crane, (no serial No.), H & N No. HS-201. (The above list does not contain any user-furnished or user-installed equipment.) Construction Contract Cost Engineering Cost 508,366.72 24,784.28 533,151.00 Outdoor sub-station consisting of three 100 KVA transformers instal- led on a reinforced concrete pad 10'-6" x 4'-6" x O'-6" thick; primary fuse cutouts, safety switches and junction box mounted on a 9'-O" high unistrut tower; station enclosed by 60 lineal feet of XIQNGddvV SUB-STATION NO, 1