II

TOTAL
COST

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BIMER, CMR AREA (Continued)
POWER DISTRIBUTION (Continued)
Three 4" transite ducts and four pull boxes were installed under the
airport. Where the tie-line crosses the airport, three single conductor #4 /0 neoprene jacketed cables, each 800 feet long, were in-

stalled in one of the 4" transite ducts.

The distribution lines to Stations 606 and Tower Stations 301 and 805

conaist of three #1/0 bare stranded copper cables, each 1350 feet
long, with twelve 40 foot poles complete with crossarms, guys and

nardware.

Six transformers were installed on poles.

Bystem

Installed equipment: 1 - 100 KVA “Westinghouse” transformer, serial
No. 5394934: 2 - 75 KVA "Niagara-Erie Electric Company” transformers,
serial Nos. 12670 and 12856.

(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost

Engineering Cost

23,249.77

876.58

24 126.35

POWER PLANT

1009-{EE-4
1013-EE-4
3006-EE-4

5 September 1952
5 September 1952
5 September 1952

30L1-BE-4
3012-EB-4
3014-EE-}

5 September 1952
5 September 1952
5 September 1952

3008-EE-4
3009-EE-)

5 September 1952
5 September 1952

4001-EE-4
4002-EE-4

6 September 1952
5 September 1952

3007-EE-4

TLeL

3010-EE-4

5 September 1952

5 September 1952

3052-EE-4

4003-EE-4

5 September 1952

11 September 1952

XIGNGddV

As-built Drawing Numbers and Dates: