TOTAL COST II ELMER, CMR AREA (Continued ) “TOA oL°L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS LIGHTING - SECURITY (Continued) E.C.0. 279 consists of providing a head guy and a guy stub at poles numbers 16 & 20, E.C.0. 284 consists of the installation of an oute door floodlight at Building 344, CMR Area. Installed equipment: Syatem 1 "Westinghouse" o11 switch, serial No. 343293, H & N No. E-353; 1 “Westinghouse” protective relay, serial No. 343683, K&N No. E-354; 1 2ho0o V. 6.6 Amp. “Westinghouse” regulator, serial No. 1590703, H & N No. E-355. | (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 8,039.73 1,097.26 9,136:99 POWER DISTRIBUTION A tie-line consisting of three #4/0 AWG bare copper wire, each 6920 feet long was installed with new srosgarms on existing poles to feed power from the CMR Power Plant to the distribution panels at Building 301 (existing Power House). The electrical alterations to Building 301 consist of installing size 200 Amp. SPDT switches and three SPST switches to provide means to transfer power onto the distribution lines from either the CMR Power The existing transformers (two 75 KVA and one 100 KVA) were relocated from the platform between poles 285 and 29E to a new sub-station enclosed with 62'-0" of chain link fence. Three additional transformers, (two 75 KVA and one 1090 KVA) were also installed in this sub-station. XIGNGddV Plant or from the tie-line.