QUAN, UNIT TOTAL COST II Yvonne (continued) “TOA Berl DESCRIPTION OF PROPERTY UNITS TANKS ~ ELEVATED - SALT AND FRESH WATER (Continued) and salt water piping and valves, and an access ladder. (No installed equipment. ) 1 Each 1 Bach 1 Each TANK - FRESH WATER STORAGE Bolted steel, fresh water storage tank, capacity 7500 gallons, mounted on a ground level platform. (No installed equipment. ) TANK BUILDING - ACID One-story wood and corrugated iron building, outside dimensions 8'-0" x 12'-0" x 9'-0" mean height, floor area 96 square feet, volume 864 and Distillation Plant, Building 106.) (No installed equipment. ) Construction Contract Cost Engineering Cost 3,644.21 290.66 3,934.87 XIQGNGddV cubic feet; constructed on previously existing concrete slab: complete with 2h0 gallon capacity redwood acid tank, and all the necessary piping and valves. (Pumps and distillation equipment installed in Power