TOTAL
COST

YVONNE (Continued )

TI “TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

WAREHOUSES «- GENERAL AND ELECTRICAL

Wood frame construction, 16'-0" x 32'-0", supporting a 16 = man canvas tent, mounted on existing concrete slab; area 512 square feet.
The General Warehouse is located approximately 10 feet north of the

Latrine, Building 108, and the Electrical Warehouse is located approximately 25 feet south of the Reefer Building 105; contains the
required electrical wiring and fixtures.

(No installed equipment. )

Construction Contract Cost

Engineering Cost

Each

1,107.91

1,114.89

6.98

WATER DISTRIBUTION SYSTEM - SALT - REHABILITATION OF
Consists of the complete rehabilitation of the salt water distribu-

tion system which consists of 1070 linear feet of 4", and 283 linear

feet of 3" transite pressure pipe, six service connections, and a

previously existing concrete salt water well.

(No installed equipment. )

7

Sys tem

WATER DISTRIBUTION SYSTEM - FRESH - REHABILITATION OF

Consists of the rehabilitation of the fresh water distribution system
transite pressure pipe, and five service connections.

(No installed equipment. )

TANKS - ELEVATED - SALT AND FRESH WATER

Two eteel, bolted 4200 gallon capacity tanks, one each for salt water

and fresh water, elevated on a timber tower, 30'-0" high, constructed

Leek

on previously existing concrete piers.

Contains ail necessary fresh

Sys tem

XIGNaddV

which consists of 380 linear feet of 4", and 973 linear feet of 3"

Select target paragraph3