QUAN.| UNIT TOTAL COST II GENE (Continued) “TOA he-L DESCRIPTION OF PROPERTY UNITS TELEPHONE FACILITIES Telephone facilities for camp services on Gene include approximately 3400 lineal feet of two conductor overhead wire, 14 telephones and service drops. (No installed equipment. ) Construction Contract Cost Engineering Cost l §$ystem 19,809.73 238.49 20,048.22 TENTS - 4-MAN Wood frame and canvas construction; 0.D. 14'-2" x 1h'-4" x 11'-6"; anchor bolted to a concrete slab; canvas fly separated from tent roof by spacer blocks and fly ridge; complete with electrical wiring and fixtures; floor area 0.D. 208 square feet. (No installed equipment.) Construction Contract Cost Engineering Cost 3 Each 1,616.59 27.86 1,644.45 TENTS - 8-MAN fixtures; floor area 504 square feet. (No installed equipment.) Construction Contract Cost Engineering Cost 65 84,870.84 1,462.70 Each 86, 333.54 XIGNGddvV Wood frame and canvas construction; 0.D. 15'-10" x 31'-10" x 11'-6"; anchor bolted to a concrete slab; canvas fly separated from tent roof by spacer blocks and fly ridge; complete with electrical wiring and