QUAN. UNIT TOTAL COST GENE (Continued) It “TOA DESCRIPTION OF PROPERTY UNITS SHEET METAL SHOP (Continued) feet, complete with electrical wiring and fixtures. Construction Contract Cost Engineering Cost Each 953.93 10.99 964.92 SEWER FACILITIES The sewer facilities on Gene include 230 lineal feet of 2" cast iron pipe; 125 lineal feet of 4" cast iron pipe; 200 lineal feet of 6" vitrified clay pipe; 435 lineal feet of 8" vitrified clay pipe; an outfall of approximately 300 lineal feet of 8" galvanized pipe with victaulic couplings; two manholes 3'-6" deep and one manhole 6'~0" deep. (No installed equipment. ) Construction Contract Cost Engineering Cost Systen 16,124.33 16,379.85 CoD De TANKS - FUEL OIL STORAGE (No installed equipment. ) Construction Contract Cost te-h Engineering Cost 166.94 1.92 Bach 168 . 86 XIGNGddV Three Navy pontoons used as tanks, mounted on an 8'-0" high wood frame platform resting on concrete piers.