QUAN. UNIT

TOTAL
COST

GENE (Continued)

It “TOA

DESCRIPTION OF PROPERTY UNITS

SHEET METAL SHOP (Continued)
feet, complete with electrical wiring and fixtures.
Construction Contract Cost

Engineering Cost

Each

953.93

10.99

964.92

SEWER FACILITIES
The sewer facilities on Gene include 230 lineal feet of 2" cast iron

pipe; 125 lineal feet of 4" cast iron pipe; 200 lineal feet of 6"
vitrified clay pipe; 435 lineal feet of 8" vitrified clay pipe; an
outfall of approximately 300 lineal feet of 8" galvanized pipe with

victaulic couplings; two manholes 3'-6" deep and one manhole 6'~0"
deep.

(No installed equipment. )
Construction Contract Cost

Engineering Cost

Systen

16,124.33

16,379.85

CoD De

TANKS - FUEL OIL STORAGE

(No installed equipment. )

Construction Contract Cost

te-h

Engineering Cost

166.94
1.92

Bach

168 . 86

XIGNGddV

Three Navy pontoons used as tanks, mounted on an 8'-0" high wood frame

platform resting on concrete piers.

Select target paragraph3