TOTAL COST II GENE (Continued) “TOA 9-1 QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDING NO. 113 - OFFICE (Continued) No. WDR-22999, H & N No. G-68; 1 - 5 KW "Palmer" generator, (no serial No.), H & N No. G-71; 1 "Famco" bench press arbor, (no serial No.), H & N No. GA-35; 1 - "Marquette" battery charges, serial No. M-11159, H & N No, GA-42; 1 - "Blackhawk" hydraulic jack, (mo serial No.), H& N No. GA-69. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 2,866.57 2,899.58 33-01 BUILDINGS 36, 37, 82, AND 83 - SHOWERS AND LATRINES - 100-MAN CAPACITY One-story wood frame construction, gable roof, rectangular shape, size G.D, 25'-0" x 36'-O" x 10'-9" mean height, set on concrete floor slab. Corrugated aluminum roofing and 3/8" plywood siding. Complete with electric wiring and fixtures fresh and salt water plumbing. area 900 square feet, volume 9675 cubic feet. Total floor The equipment in each unit includes eight toilets, eight toilet en- closures, six urinals, éight lavatories, ten shower heads, eight mirrors and one water cooler with drinking fountain mounted on a concrete pad adjacent to building. Installed equipment: 4 - 10 gallon "Larco" water coolers, (no serial Nos.), H & N No, CA-243, CA-739, CA-133, CA-134, one in each building. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 53,781.42 281 .08 54,062.50 XIGNadddv¥ Each