BUILDING NO. 113 - OFFICE (Continued)
No. WDR-22999, H & N No. G-68; 1 - 5 KW "Palmer" generator, (no serial

No.), H & N No. G-71; 1 "Famco" bench press arbor, (no serial No.),

H & N No. GA-35; 1 - "Marquette" battery charges, serial No. M-11159,
H & N No, GA-42; 1 - "Blackhawk" hydraulic jack, (mo serial No.), H& N
No. GA-69.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

2,866.57

2,899.58

33-01

BUILDINGS 36, 37, 82, AND 83 - SHOWERS AND LATRINES - 100-MAN CAPACITY
One-story wood frame construction, gable roof, rectangular shape, size
G.D, 25'-0" x 36'-O" x 10'-9" mean height, set on concrete floor slab.

Corrugated aluminum roofing and 3/8" plywood siding.

Complete with

electric wiring and fixtures fresh and salt water plumbing.

area 900 square feet, volume 9675 cubic feet.

Total floor

The equipment in each unit includes eight toilets, eight toilet en-

closures, six urinals, éight lavatories, ten shower heads, eight mirrors
and one water cooler with drinking fountain mounted on a concrete pad

adjacent to building.

Installed equipment: 4 - 10 gallon "Larco" water coolers, (no serial
Nos.), H & N No, CA-243, CA-739, CA-133, CA-134, one in each building.
(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

53,781.42
281 .08

54,062.50