TOTAL
COST

II

GENE (Continued)

"TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUILDINGS 105 AND 109 - DEISEL FUEL TANKS
Bolted steel, navy pontoons, resting on 8'-0" high wood frame platforms.

Each

(No installed equipment. )
Construction Contract Cost

78,954.69

78,954 .69

BUILDING NO. 6 - REPAIR SHOP

One-story wood frame construction, rectangular shape, size 0.D. 28'-0"
x ho'-h" x 12'-8" mean height set on stabilized coral floor. Corru-

gated aluminum gable roof. Structure is enclosed on one side and one
half of one end only, corrugated aluminum siding. A six foot high
partition divides shop into two sections. Complete with electric
wiring and fixtures. Five build-in work benches are installed. Floor
area 0.D. 1129 square feet, volume 14,300 cubic feet.

Bach

BUILDING NO. 113 - OFFICE
One-story wood frame construction, rectangular shape, size 0.D.

6'9-1/4" x 10'9-1/4" x 9'2-1/2" mean height, set on timber skids.
Composition shed roof, wood floor and plywood siding.

672 cubic feet.

Floor area 0,D. 73 square feet, volume

1 - 10" and 2 - 7" "Blue-Point" bench grinders, (no serial Nos.), H &

Nos. TM-64, TM-75, TM-77; 1 - 1/2" "Thor" bench drill, serial No.
323649, H & N No. TM-139; 1 - 1/2" "Skilsaw" bench drill, serial No.

645316, H & N No. TM-282; 2 - 300 amp. and 2 - 400 amp. "Lincoln"

welders, serial Nos. A-232714, (None), A-237563, A-237562, H & N Nos.
W-12, W-25, W-19, W-20; 1 - 75 KW "Onan" generator, serial No.

c- 2

g4-187587, H & N No. G-8; 1 - 50 KW "International" generator, serial

y

XIGNGddV

electric wiring and fixtures.

Complete with

Select target paragraph3