TOTAL COST II GENE (Continued) "TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDINGS 105 AND 109 - DEISEL FUEL TANKS Bolted steel, navy pontoons, resting on 8'-0" high wood frame platforms. Each (No installed equipment. ) Construction Contract Cost 78,954.69 78,954 .69 BUILDING NO. 6 - REPAIR SHOP One-story wood frame construction, rectangular shape, size 0.D. 28'-0" x ho'-h" x 12'-8" mean height set on stabilized coral floor. Corru- gated aluminum gable roof. Structure is enclosed on one side and one half of one end only, corrugated aluminum siding. A six foot high partition divides shop into two sections. Complete with electric wiring and fixtures. Five build-in work benches are installed. Floor area 0.D. 1129 square feet, volume 14,300 cubic feet. Bach BUILDING NO. 113 - OFFICE One-story wood frame construction, rectangular shape, size 0.D. 6'9-1/4" x 10'9-1/4" x 9'2-1/2" mean height, set on timber skids. Composition shed roof, wood floor and plywood siding. 672 cubic feet. Floor area 0,D. 73 square feet, volume 1 - 10" and 2 - 7" "Blue-Point" bench grinders, (no serial Nos.), H & Nos. TM-64, TM-75, TM-77; 1 - 1/2" "Thor" bench drill, serial No. 323649, H & N No. TM-139; 1 - 1/2" "Skilsaw" bench drill, serial No. 645316, H & N No. TM-282; 2 - 300 amp. and 2 - 400 amp. "Lincoln" welders, serial Nos. A-232714, (None), A-237563, A-237562, H & N Nos. W-12, W-25, W-19, W-20; 1 - 75 KW "Onan" generator, serial No. c- 2 g4-187587, H & N No. G-8; 1 - 50 KW "International" generator, serial y XIGNGddV electric wiring and fixtures. Complete with