De, fe
.
"
.
R S20910
Pop
bieitd
/
.
,
7
of
“ip bs
.
re
ag
(2)
Provide twelve (12) F-84 aircraft for necessary
1
sampling
(3)
Provide four (4) B36‘atroraft for control, effects and
(4)
Provide one (1) B-47 aircraft for an effects mission on
Y-Day. (See Annex J, TG 7.4 Operations Order 2-54).
(5)
Integrate the operations of three (3) B-50 aircraft into
(6)
Assure adequate sample removal procodures for Y-Day.
Annex R, TG 7.4 Operations Order 2-54).
'
missions for Y~Day,
-
.
(7)
(8)
(9)
(See Annex H, Operations Order 2-54).
sampling missions for Y-Day. (See Annexes G, I, and K,
TG 7,2, Operations Order 2-54).
.
’
Y-Day.
(See Annex 0, Operations Order 2-54).
(Sec
Augment the field maintenance facilitics of the Test Sup~ |
port Unit as required,
-
Provide for complete care, storage and issue of personal —
equipment to ali air crews of the Test Aircraft Unit. :
Prepare the marshaling plan for all aircraft which will de-~
part from EATVETOK to participate in Y-Day and special
missions.
1
(10)
Prepare a post mission paricing plan for ‘all eirctatt that
will land at ENIWETOK after the completion of their mission.
(11)
Propare a mission execution chart and assure that takeoffs
and landings are accomplished as specified in Annex C,
(12) Provide for aircraft decontemination.
‘b.
Test Services Unit:
.*
(1)
Execute assigned missions, including that snecified in Annex A.
(2)
Provide three (3) C~54 photographic aircratt and crews for
(3)
-
Provide a
- dequate SA-16 and other required SAR support, to
the AOC and CIC for operational control throughout the
(4)
Y-Day.
(See Annex L, TG 7.4 Operations Order 2-54).
Day mission.
(Sea Annex PF, TG 7:4 Operations Order 2-54).
Provide adequate WB-29 weather reconnaissance, cloud tracking and sampling services throughout the Y-Day mission,
(See fnnox M, TG 7.4 Operations Order 2-54).
(5)
Assure adequate pre-mission weather forceasting as required
for the Y-Day mission.
.
(6)
Provide necessary wéather briefings and woather reports to ‘
the ‘CIC and A0C throughout. the Y-Day mission,
(7) . Assure adequate communications facilities throughout the
YDay mission.
.
‘
(8)
Augmont the ficld maintenance fecilities of the Test ‘Support
Unit es required. -
(9) Coordinate with Test Aircraft Unit to assure that “Tost Services
Ce
:
TASK GROUP 7.4.
OPRS ORDER HO, S54
.
os
Totti
Pik820039 2
Ce
ae
be mee
bof way : =
:
. ‘
at
'