The progress report covering thru 15 Dec, 61 mentions under the heading / of hydrodynamic techniques experiments being planned There are other discussions in these early progress reports of such experiments going on at some location, I assume 410, with results being obtained by this group. The discussion in this report of the Gnome event emphasizes the myriad of problems that the people ran into with the equipment once it had been shipped to the field, due in part to the poor prepara was salvaged because of the efforts for shipment and the fact that certain data of personnel in the field. events After a brief discussion of each of the NTS of the problems there due partly to lack being planned and prepared for and some in noted as not having any progress in certa of personnel, the Pacific operation is personnel." due "to absence in the field of appropriate Furthermore, and m "electronic oscilloscope recording syste significantly, the development of the NTS of its components for use in operative actually regressed due to scavenging systems. \ As of 15 Dec. 1961, AFSWC has done a large amount of work on a distance Cerrar measuring equipment (DME) system for use in the upcoming air drops. This is HR reported on by AFSWC to Systems Command Headquarters as of the 15th of Dec. and it is by no means a completed project as of this date.” The reports of the three tests of system that has been developed to date have not yet attained a satisfactory drop test where the drop ‘shape with the transmitter was able to be tracked by the three aircraft (2 C-130's and B-52). The goal of the system is to obtain accuracy of .25% over ranges of 15 miles and the tests to date have included some air borne ‘tests over White Sands. This brief study outlines the future plans to modify the system and continue testing it until if is satisfactory.

Select target paragraph3