Several letters specifically on the testing program were written in the next few months by the Director or Gerry Johnson. fP The first of these on 16 April ——-~- Sey 59 from Teller to Starbird followed a message from Starbird on 13 April that qeee gave some guidance on the funding and preparedness limitations due to plans for no tests in FY 60 but limited readiness capability. Teller sets forth a test program that Livermore would like to see pursued if testing could be resumed in the summer or fall of 59 and would take testing up thru Sept. 1960. In tabular form is presented those weapons developments shots as well as some Plowshare and detection shots which Livermore would wish to do with the site and device ready dates ranging from the lst of June and fall for the devices thru 1960 and into 1961 in some cases. specifically shown. Over a dozen weapon development tests are After discussing at length the known geology of the NTS and the containment rules felt to be conservative (550 W to the 1/3rd or over—burden in tuff and 600 W to the 1/3rd or 0. point separation in neighboring tunnels), several tables of specific devices with the proposed tunnel site and the schedules for necessary construction to meet certain readiness dates accompany a detailed drawing of the configuration of the tunnels in Nevada to meet this list of some dozen and a half safety and full-scale weapons test. Noting that some immediate authorization for construction at the NTS would be needed to meet these schedules, Teller concludes, “As mentioned in the first paragraph, our suggested program is predicated on a change in these assumptions (limited funding and preparedness), and we would propose acting on it only in case the probabilities have altered so that those assumptions can be changed. can be hidden. It is an accepted fact that underground Considering that the U.S. has now made a proposal at Geneva which would allow underground tests for the time being, it seems appropriate to LRL to demonstrate that we are serious about underground testing by undertaking such a tunnel program now."

Select target paragraph3