a navn td a; Pian
Operction
OMe

-—

tas

CTG 73 Woe 1-53
MEMS OF PuPOrl & FORMAT

DéTS PB QUIRED

aNCS

Leparture Statement

CTG 7.3 I nstr 5521,2
S.ction IV

from Forward area

Doubtful Chsractor or Loyelty

annex D, Part IT,
para 7

when appropriate

BspLonage

annex D, Part If,
para 7

When apprepriate

annex D, Part II,

When appropriate

Annex D, Pert I,

When appropriate

Annex D, Part II,

When appropriate

Electronic Feilure

Annex F,

pora 548, (3)

When occurring

Crystal Procurement

Annex F,

para

Radio Intcrfcrence

annex F, pore 9

When occurring

CASTLE Communication Ruport

annex F, para 18

Fiftcen days after
completion C.STLe
operationel phase

Atomic Defense Lrill and

CTG 7.3 instr 0344C.1h

arrival in Forward area

Fall-Out Report

annex G, Para 64a

Whon occurring

Contamination of Porsonnel

annex G,

para 720(1)

Upon completion of
Cperaticn

Perfcrmanes of iediac

annex G,

pare 7.2.(2)

Upon completion cf
Operetion

Return cf 2adiac Equipment

anncx G,

para. Take (3 )

list of Personnel Issued

ennex G, ‘éppendix I,
paras 9 ani

Sabotaga
Suspicious airer:ft, surface

or submarine vessel

Confiscated itcms of contraband

Inspection

and iquipnent
Equipment

Film Budgcs

para 7

para 7
pare 7

5.b. (1)

£17 Sept 1953

XR

Prior to departure

Twenty days prior deperture for Forwerd srea

Upon completion of

Operetion

Whon oecurring

Select target paragraph3