a navn td a; Pian
Operction
OMe
-—
tas
CTG 73 Woe 1-53
MEMS OF PuPOrl & FORMAT
DéTS PB QUIRED
aNCS
Leparture Statement
CTG 7.3 I nstr 5521,2
S.ction IV
from Forward area
Doubtful Chsractor or Loyelty
annex D, Part IT,
para 7
when appropriate
BspLonage
annex D, Part If,
para 7
When apprepriate
annex D, Part II,
When appropriate
Annex D, Pert I,
When appropriate
Annex D, Part II,
When appropriate
Electronic Feilure
Annex F,
pora 548, (3)
When occurring
Crystal Procurement
Annex F,
para
Radio Intcrfcrence
annex F, pore 9
When occurring
CASTLE Communication Ruport
annex F, para 18
Fiftcen days after
completion C.STLe
operationel phase
Atomic Defense Lrill and
CTG 7.3 instr 0344C.1h
arrival in Forward area
Fall-Out Report
annex G, Para 64a
Whon occurring
Contamination of Porsonnel
annex G,
para 720(1)
Upon completion of
Cperaticn
Perfcrmanes of iediac
annex G,
pare 7.2.(2)
Upon completion cf
Operetion
Return cf 2adiac Equipment
anncx G,
para. Take (3 )
list of Personnel Issued
ennex G, ‘éppendix I,
paras 9 ani
Sabotaga
Suspicious airer:ft, surface
or submarine vessel
Confiscated itcms of contraband
Inspection
and iquipnent
Equipment
Film Budgcs
para 7
para 7
pare 7
5.b. (1)
£17 Sept 1953
XR
Prior to departure
Twenty days prior deperture for Forwerd srea
Upon completion of
Operetion
Whon oecurring