Operation rlan
OTG 7,3 No. 1-53

(2)

Water spray equipnent:

Packaged weather deck spray units

together with installation plans heve been develeped by BuShips,

These

units will be issued by the Supply Officer of the USS 2AIROKO (CVE~115)

te ships of the task group in the ferward area, The purpese ef these units
is tm reduce the hazard of contenination fron fall-out,

(3)

Filo badge desinetors will be furnished by CTG 7.1 in the

(4)

Decontamination clothing,

forward area,

Decentamination suits equivelent te

these described in detail in paragraph 3p (2) (a) of Appendix III of this

dunex shall be ebtained for personnel of repair parties, Waterpreef suite
when worn in tropleal climates cause heat prostration too quickly te be

ernsidercd practical for thia operation,
dz;

Maintenance and Calibration of Rrdiae Equipment,

Units ef Task

Grdup 7,3 are responsible for the naintenence of their awn rediee equipment,

For repairs beyond tne capacity of ship's force, a radiac instrunent

repcir center and reserve instfument pool will be maintained by OTG 7.3

atesf personnel eboard the USS BAlNOKO,

Radiac instruments needing

calibration will ordinerily be brought to the USs BalitO.0 for calibretind,
Training uxeccises and calibration drilis, supervised by steff nenbers of
CTG 97.3, will be conducted for all ship's monitoring end deconteninetion

parties aburrd the USS Bilxono,
5.

Pre-Shot rhese Specific Requirements

a.

BalHOKO (CVE-115)

(1) Assist TG 7,1 to establish the follewing:
(a)

Phnto dosimetry laboratory.

(bd)

Radiological center.

(a)

Provide space end pewer for trailer laboraters en nanger

(a)

¥rovide space for radinc instrument repair shep,

deck,

(2)

Provide space for TG 7,3 redinc instrument repair center,

(3) Provide facilities for and develep proficiency in decontaninatirn
ef aireraft an board ship,

G3 -

Select target paragraph3