Operation rlan OTG 7,3 No. 1-53 (2) Water spray equipnent: Packaged weather deck spray units together with installation plans heve been develeped by BuShips, These units will be issued by the Supply Officer of the USS 2AIROKO (CVE~115) te ships of the task group in the ferward area, The purpese ef these units is tm reduce the hazard of contenination fron fall-out, (3) Filo badge desinetors will be furnished by CTG 7.1 in the (4) Decontamination clothing, forward area, Decentamination suits equivelent te these described in detail in paragraph 3p (2) (a) of Appendix III of this dunex shall be ebtained for personnel of repair parties, Waterpreef suite when worn in tropleal climates cause heat prostration too quickly te be ernsidercd practical for thia operation, dz; Maintenance and Calibration of Rrdiae Equipment, Units ef Task Grdup 7,3 are responsible for the naintenence of their awn rediee equipment, For repairs beyond tne capacity of ship's force, a radiac instrunent repcir center and reserve instfument pool will be maintained by OTG 7.3 atesf personnel eboard the USS BAlNOKO, Radiac instruments needing calibration will ordinerily be brought to the USs BalitO.0 for calibretind, Training uxeccises and calibration drilis, supervised by steff nenbers of CTG 97.3, will be conducted for all ship's monitoring end deconteninetion parties aburrd the USS Bilxono, 5. Pre-Shot rhese Specific Requirements a. BalHOKO (CVE-115) (1) Assist TG 7,1 to establish the follewing: (a) Phnto dosimetry laboratory. (bd) Radiological center. (a) Provide space end pewer for trailer laboraters en nanger (a) ¥rovide space for radinc instrument repair shep, deck, (2) Provide space for TG 7,3 redinc instrument repair center, (3) Provide facilities for and develep proficiency in decontaninatirn ef aireraft an board ship, G3 -