SRRCRESesSeeakeeeae
ama
Joint Task Foren SEVEN
Qperntian Dea
Washdagten 25, D.C.
7 Deeenber 1953, 1290R
C?G
703
Ne,
Task Group 7.3
3
Angex N
Airlift Pla,
1,
General,
2.
Ister-l
This aanex supplements agnex & of CJTF SEVEN OpPlen 3-53 which
4a effective for all shipa end units of TG 7,3,
Adrlif’
Onerat¢ion
e. bik atolls
(1) - Regpeneibility fer scheduling and dispetching all TG 7,3 heli-
coptera (and such TG 7,4 helicepters as may be assigned) at BIKINI er 1.
board the CVE is delegated t» CTU 7.3.2 (Coumanding Offieer, BalHOKO),
(2)
Detailed requirements for helieopter lift at BIZINI shall we sub-
nitted direct te B.IKOKO, prior te the day the lift ia required 4asofer as
possible,
(3)
I, the event Joint teak ferce lift requirenenta erceed the avedl~
eble lift, the natter cannet be resolved to the mutual satisfacties of ell
coneerned by the Conmegding Officer, RBAIROKO, the matter shall te referved te
erc 7.3. In the event CTG 7,3 cannet resrlve the oettcr by mitusl nerceccut,
he will refer it te CJTF SEVEN (er his designated representative on site)
fer decision,
B. dt ENTWEROK Atoll,
(1)
Detatled requirements for iater-islend airlift at RNIWETOK
shall be submitted direct te CTG 7.4, or such representative aa he may
designate, prier te the dete the. lift is required insefar on peerthle,
3.
Interdtell Ajplift Operations.
&,
Reqiromente fer interwetell alrl.rs
shall he snbritted direct te
CTG 7.4, Sr ounh representative cs he may desigunate, prior tn the dnte the
lift is required ‘Ingsafar os possiblic,
AWTHENTICATEDS
H, 0. BRUTON
Rear Adniral
Connnndor
re
Ne]