FOOTNOTES FOR CHAPTER IV (Contd)
B,

ARRIVAL AND ASSEMBLY TIMES OF THE DEVICES

BRAVO
25 January - Unit arrived at Eniwetok
17 Februsry - Final assembly completed

18 February - Shipped to Bikini and trans-shipped to cab on 20 February
22 Feb
- Installation in cab completed

oo
January
March
March
March
March

11 March

ie

bh

aon

25 January
9 April
j

14 April

16 April

-~
-

Unit arrived at Eniwetok
Final assembly completed
Unit installed on barge
Barge departed for Bikini ind

y

ers

é
crater and cables checked out

(used small one)

- Unit arrived at Eniwetok
Assembly completed

ot

25
4
5
7
9

Reassembled after postponement and loaded on barge
~- Barge departed for Bikini in LSD
:
d—and.cables checked out

- Final. assembly completed after postponements and
loaded on barge

~ Barge towed to MIKE crater at north end of Eniwetok
lagoon, anchored, and cables checked out

ags attachedto the case

AFWUHC