FOOTNOTES FOR CHAPTER IV (Contd)
B,
ARRIVAL AND ASSEMBLY TIMES OF THE DEVICES
BRAVO
25 January - Unit arrived at Eniwetok
17 Februsry - Final assembly completed
18 February - Shipped to Bikini and trans-shipped to cab on 20 February
22 Feb
- Installation in cab completed
oo
January
March
March
March
March
11 March
ie
bh
aon
25 January
9 April
j
14 April
16 April
-~
-
Unit arrived at Eniwetok
Final assembly completed
Unit installed on barge
Barge departed for Bikini ind
y
ers
é
crater and cables checked out
(used small one)
- Unit arrived at Eniwetok
Assembly completed
ot
25
4
5
7
9
Reassembled after postponement and loaded on barge
~- Barge departed for Bikini in LSD
:
d—and.cables checked out
- Final. assembly completed after postponements and
loaded on barge
~ Barge towed to MIKE crater at north end of Eniwetok
lagoon, anchored, and cables checked out
ags attachedto the case
AFWUHC