Throw MG Test Toggle Switch on Inverter, starting
panel to OFF position.

MG should now STOP.

Throw S2, S3, S4, $5, S7, S8, S9, S10 on each

Control Panel to TIMER position,

Red panel

(If camera is not being used on this

Blue panel

shot, leave its switch in OFF position)

Yellow panel

Install fuse wire and set camera curtain in Position

10,

Signal cable in position

ll.

Generator cutout cable in position, Switch on.

Generator is in Electric Start position, and
generator running.
12,

Gas generator power cable in position

13.

Check that all timers are in START position
"

MIR
MZR
MIB
MILY

14,

Set heater

15.

Install necessary chocks at trailer and generator

16,

Remove rear platform.

17.

Check that vehicle canvas tops, doors and windows
are properly set.

18.

Secure loose objects.

SIGNATURE

ot

oor,

» fF (; bf

af LL

~

Paroty

Z

- 40 -

Select target paragraph3