APPENDIX II.

SAMPLE CHECK LIST No. Zz.

PHOTO STATION GENERAL ELECTRICAL FINAL CHECK LIST, EG&G.
Shot

Location

Date

l.

Visually check all Connectors.

2.

Throw the following switches to OFF position: SIR
S6R
S1B
SLY
Charger #1 Input

Charger #1 Output
Charger #2 Input
Charger #2 Output

3.

Throw the following switches to ON position:
Gas Generator AC
24 V DC
1Z0O VDC

A

120 V DC

B

200 CPS (R) 2 Switches
200 CPS (B) 2 Switches
200 CPS (Y) 2 Switches

4.

Throw change-over switch to MG position.
{Check that this switch is securely in position)

5.

Throw MG Test Toggle Switch on Inverter Starting
Panel to ON Position.

MG SHOULD NOW BE

OPERATING.

6.

Check that the following voltages appear on the

Distribution panel:

120 V AC
12zO VDC

A

120 VDC

B

24V DC

POR 8 6 |

ere

ns