HOLMES & NARVER, Inc ENGINEERS-CONSTRUCTORS Wve oy TO: S. P. Howell _j08: G2 FROM: L. S- Hammond __RE: Precise Surveys Bikini Atoll DATE:__July31,1957= Reference is made to J6=3816 w/encl. Secret, dated June 25, 1957, which specifies a first order horizontal and vertical interrelation between scientific stations to be located on site HOW and a station on site NAN at Bikini Atoll. To provide this interrelation to first order. procedures,would require an extensive horizontal control survey including a first order base line on HOW and a new lagoon station west of HOW. The following recommen- ded procedures are based on modification of this requirement to specify that the inter-relation be determined to within a tolerance of13255000, but eliminating the requirement for first order proceauree (1) HorizontalControl An evaluation of the existing network indicates that due to the strength of the original survey and the relatively small area involved, horizontal inter- relation within the tolerance of 1:25, 000 can be accomplished in the following manner. This is on the assumption that stations Worth HOW, South HOW and NAN have not been disturbed. (a) An adjustment by the method of least squares will be applied to the original 1953 survey, and to the 1955 expansion survey. This will determine the most probable values for the stations of the network, including the stations on HOW and NAN. The closing error of the original 1953 network, before adjust- ment, was better than 1:70,000 and a very low probable error was determined tor the base line. With this strength it is safe to assume that the adjusted values for HOW and NAN will meet requirements of 1:25,000. (b) The horizontal location of the primary working point on HOW will be determined by observing the triangle WP - North HOW - South HOW to first order procedures. (c) The additional working points on HOW will be located by first order traverse procedures from these stations. The working point for the station on NAN will be located by the same procedures in reference to triangulation station NAN.

Select target paragraph3