J-3 Daily Diary
ENIWETOK Atoll
J3-DDH-E165
1.
;
9 August 1958
MISCELLANEOUS:
Dr. Held Project Officer for the Program 40 RONGELAP survey arrived today and
met with CDR Wendell and Maj Monaco.
It developed that the M.V. ALOTO will arrive on the 10th of August. Loading
will take place on the lith and the ship will sail on the 12th. The survey
is to be completed by the 24th.
CTG 7.3 has been requested to arrange for UF support and CTG 7.4 has been
asked to provide photographs of certain islands in the atoll. TG 7.5 will
provide vehicle support and J-1 has handled all the required clearances. (JHW)
2.
PUBLICATIONS:
The following documents were published and distributed this date:
(JHW)
3245-JFE
Operational Letter FIG - 1 - Ready Date and Shot Time
8Aug58.
3250-JFE
Operational Letter FIG - 2 - Prediction of Effects and
Operational Planning Factors
8Aug58
3247-JFE
Maxim Safety Limits of Design Yield for FIG
Bhug58
3256-JFE
Air Support for Program 40
9Aug58
|
3258-JFE Aerial Photography of RONGELAP
9Aug58
3261-JFE
Operational Letter FIG - 3 - Ready Date and Shot Time
gAug58
3262-JFE
Operational Letter FIG - 4 - Organization and Movement
9Aug5s8
of the Arming Team
DISTRIBUTION:
1 - J-3 (Wendell)
JHW
AWM
1 ~ D/A (Curry)
WLM
1 ~ J-3 (Lucke)
MW
WIM
-
cop
Lary Poog
uf
RG
326 US ATOMIC ENER
GY
SELISSION
Location
CREE
S
e
CollectiosRenn
Folder
“S-
1
5
(Hondé
Ter F23
-
38
213
*8