See 411061 J-3 Daily Diary ENIWETOK Atoll J3-DDH-E165 1. ; 9 August 1958 MISCELLANEOUS: Dr. Held Project Officer for the Program 40 RONGELAP survey arrived today and met with CDR Wendell and Maj Monaco. It developed that the M.V. ALOTO will arrive on the 10th of August. Loading will take place on the lith and the ship will sail on the 12th. The survey is to be completed by the 24th. CTG 7.3 has been requested to arrange for UF support and CTG 7.4 has been asked to provide photographs of certain islands in the atoll. TG 7.5 will provide vehicle support and J-1 has handled all the required clearances. (JHW) 2. PUBLICATIONS: The following documents were published and distributed this date: (JHW) 3245-JFE Operational Letter FIG - 1 - Ready Date and Shot Time 8Aug58. 3250-JFE Operational Letter FIG - 2 - Prediction of Effects and Operational Planning Factors 8Aug58 3247-JFE Maxim Safety Limits of Design Yield for FIG Bhug58 3256-JFE Air Support for Program 40 9Aug58 | 3258-JFE Aerial Photography of RONGELAP 9Aug58 3261-JFE Operational Letter FIG - 3 - Ready Date and Shot Time gAug58 3262-JFE Operational Letter FIG - 4 - Organization and Movement 9Aug5s8 of the Arming Team DISTRIBUTION: 1 - J-3 (Wendell) JHW AWM 1 ~ D/A (Curry) WLM 1 ~ J-3 (Lucke) MW WIM - cop Lary Poog uf RG 326 US ATOMIC ENER GY SELISSION Location CREE S e CollectiosRenn Folder “S- 1 5 (Hondé Ter F23 - 38 213 *8

Select target paragraph3