from the retired bombs and shipped to AEC plants for rework.

pees
Most of the rem2ining portions
of the retired bombs will be shipped to Oak Ridge for salvage.

peLeTe®

WEAPONS DEVELOPLENT
8. Weapons programs in the development ohnase are described
in Table 1.
)

ver
ve

rneads

Emphasis in weapons development is being placed on

for Department of Defense missiles,

weapons with

a

g eatly reduced radioactive fallout, more rugsed weapons,
moc> efficient weapons.

and

Developmental programs added since

the last quarterly report are the XW-47 and the TX-48.

All

development programs for implosion-type weapons provide for

I

Pep be Oat eee
“oe

o-

woah.

9. A modification of XW-28 is being made to provide
emergency capability thermonuclear warheads for the Intermediate
Range Ballistic Missile.
the XW-49,

This modification has been designated

and the warheads are

scheduled to be available in
a

10. Tne following feasibility studies,

requested by the

Department of Defense, were in progress on December 31,

- 9 -

1957:

Part III

Select target paragraph3