In compliance with Article III, "Job No. 5", paragraph 1, of Con-

tract No, AT-(29-1)-507, recommendations for the "roll-up" procedure

to be employed on Eniwetok Atoll at the close of Operation GREENHOUSE
are presented in the following pages. These recommendations are intended to cover the disposition of all facilities remaining at the end

of the exercises, including both those which are to be stored on the

Atoll and those to be shipped to the Zone of the Interior (Z.I.).

The general roll-up procedure is discussed under four major head1,

Structures on Experimental Islands

2.

Structures on Support Islands

3.

Equipment

4.

Furniture and Fixtures

Under each of these major headings are a mumber of types of items

which are discussed individually.

Immediately following the general procedure, three supplements are
presented covering specific details of the roll-up. These are:

Supplement 1.

Guide Specifications for Procedures in Preparing Equipment and Materials for Storage

Supplement 2.

Materials on Hand at Jobsite for Use in Roll-

up
Supplement 3.

Property Lists Including Disposition by Surveys and Storage Location

Taken together, the general procedure and specific supplements are

intended to give a detailed picture of Holmes & Narver's recommendations

for the Operation GREENHOUSE roll-up.

NEIL H. DURKEE

Project Manager

18-10

Select target paragraph3