JOB 5 WORK ORDERS (Continued)
AEC
W.0,No,

Description

Date
Issued

Site

User

980

Supply lumber & plywood cut to size and

4/28/51 B,D NRLH

981

Replace 2 broken panels on instrument

4/28/51

B

EG&G

982

Widen door opening in tower cab.

4/28/51

V

All Users

983

Install two tents behind Station 132b.

4/28/51

E+ NRLK

984

Install air conditioning at 132b.

4/28/51

Er NRLK

985

Furnish 1 piece 4' x 8' x 5/8" plywood.

4/28/51

B

986

Remove fill & lead bricks; relocate lead

4/30/51

E* NRLK

987

Place two COofire extinguishers in tower

4/30/51

V

All Users

988

Locate, dig & backfill 12 holes for

4/30/51

D

2.4

989

Cancel WO #641; perform misc. work on

4/30/51 DeV

TU 3.1.9.4

990

Labor & equip. for recovery work in

4/30/51

NOBL

991

Remove I beam from tower.

4/30/51

V

J-3

992

Request for 12 each of FS #373 and #288

4/30/51

B

Prog. 4

993

Make three 1/4 inch thick steel plates.

4/30/51 V-D, NBS

994

Furnish labor & equipment to work on

5/1/51

iB

Prog. 6.3

995

Furnish & weld 15 sample holders.

5/1/51

2B

J-3

996

Machine 75 sample holders.

5/1/5l1

2B

J-3

997

Furnish bulldozer & labor to recover

5/1/5l

J-3

17-58

shape,

cover.

bricks,
cab.

expos. units.
Scistat.

tower area,

charts,

tanks,

J=-3 equip.

NBS

B

Select target paragraph3